Document Type
Paper
Abstract
The Fall 2011 ENGR333 project focused on the Bunker Interpretive Center (BIC) at Calvin University.
I asked the students “What would it take for Calvin College to obtain an Energy Star rating for the BIC? Or, if the BIC already qualifies for an Energy Star rating, what would it take to improve the energy efficiency of the BIC (as measured by Energy Star metrics) by 15%, thereby ensuring Energy Star performance of the building into the future?”
Customer
As I recall, the customer for this project was Biology faculty member Randy Van Dragt.
Publication Date
Fall 9-6-2011
Recommended Citation
Heun, Matthew K., "2011 Fall ENGR333 Project Assignment" (2011). ENGR 333. 59.
https://digitalcommons.calvin.edu/engr_333/59