The goal of the project was to construct a realistic plan to get Calvin off the grid. This means that Calvin would own and operate on-site facilities that generate all the electricity consumed by the campus. Current peak load for the college is approximately three megawatts. Upon completion of the new recreation center and dining hall renovation, future load will climb to roughly five megawatts. As a result, the desired system to remove the college from the grid would provide five megawatts.
Publication Date
12-16-2004
Recommended Citation
DeKam, Matt; Wiesehan, Chris; Flietstra, Jason; Hanson, Jeremy; Katerberg, Brian; Palmer, Kevin; Svacha, Aaron; Buys, Aaron; Blocker, Josh; Vredevoogd, Matt; Huisjen, Andrew; Totoe, Thomas; VanderMoren, Andy; and VanRoekel, Chris, "2004 Fall ENGR333 Final Report on Co-Generation (Section A)" (2004). ENGR 333. 79.