Document Type

Paper

Abstract

The goal of the project was to construct a realistic plan to get Calvin off the grid. This means that Calvin would own and operate on-site facilities that generate all the electricity consumed by the campus. Current peak load for the college is approximately three megawatts. Upon completion of the new recreation center and dining hall renovation, future load will climb to roughly five megawatts. As a result, the desired system to remove the college from the grid would provide five megawatts.

Publication Date

12-16-2004

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.